“Siberian Anthracite” puts a crushing and screening unit for “Listvyanskaya-2” washing plant into operation
A crushing and screening unit of “Listvyanskaya-2” washing plant was put into operation on February, 16. It would increase the annual capacity of “Listvyanskaya-2” from 1.5 to 1.9 million tonnes of unwashed anthracite (+27%). The washed anthracite output will increase up to 87.5% (+17.5%). Waste products volume will decrease to 12.5% (-17.5%). The flocculant consumption will be reduced by 60%.